In this problem you will be constructing a simple weighted directed graph.
A 0-1 cut in the graph is a subset S of vertices that does contain the vertex 0 but does not contain the vertex 1. Let T be the complement of S. The size of the cut is the total weight of all edges that lead from S to T. (The weight of edges from T to S does not matter.) A 0-1 cut is called a minimum 0-1 cut if its size is the smallest among all 0-1 cuts.
You are given an int n. Construct any undirected graph with the following properties:
- The number of vertices must be between 2 and 20, inclusive.
- The vertices must be numbered 0 through v-1, where v is their number.
- The graph must be simple - i.e., no self-loops and no multiple edges going in the same direction. (However, for any distinct x,y the graph may contain both an edge from x to y and an edge from y to x.)
- All edge weights must be integers between 1 and 10^9, inclusive.
- The graph must have exactly n different minimum 0-1 cuts.
Suppose the graph you constructed has v vertices and e edges. Return a int[] with 1 + 3*e elements. Element 0 of the return value should be the number v of vertices. The rest of the return value should be a list of edges. For each edge i, give its source vertex si, its destination vertex ti, and its weight wi. That is, the return value should be formatted as follows: { v, s0, t0, w0, s1, t1, w1, ... }.
If there are multiple correct solutions, you may output any of them.
Definition
- Class:
- MinimumCutsAgain
- Method:
- construct
- Parameters:
- int
- Returns:
- int[]
- Method signature:
- int[] construct(int n)
- (be sure your method is public)
Constraints
- n will be between 1 and 1,000, inclusive.
Examples
1
Returns: {2, 0, 1, 6 }The return value describes a graph on 2 vertices. There is an edge from vertex 0 to vertex 1 of weight 6. This graph has exactly one minimum 0-1 cut: the cut {0}. The cost of this cut is 6.2
Returns: {3, 0, 2, 1, 0, 1, 1, 2, 1, 1 }There are two different minimum 0-1 cuts: the cut {0} and the cut {0,2}. Each of these cuts has cost 2.4
Returns: {4, 0, 2, 4, 2, 1, 4, 0, 3, 2, 3, 1, 2 }This time there are four 0-1 cuts: {0}, {0,2}, {0,3}, and {0,2,3}. The cost of each of them is 6. Thus, all four cuts are minimum 0-1 cuts.6
Returns: {6, 0, 1, 1, 0, 5, 2, 1, 0, 4, 1, 2, 1, 1, 3, 2, 1, 4, 1, 2, 5, 1, 3, 4, 2 }The minimum 0-1 cuts in this graph have cost 1. There are six such cuts: the cuts {0,2,3,4,5}, {0,2,4,5}, {0,2,5}, {0,3,4,5}, {0,4,5}, and {0,5}.752
Returns: {20, 0, 16, 1, 1, 5, 2, 2, 11, 2, 3, 5, 2, 5, 2, 1, 5, 3, 1, 5, 11, 1, 7, 4, 2, 7, 18, 1, 9, 3, 2, 9, 17, 1, 11, 10, 2, 13, 1, 1, 13, 5, 2, 13, 15, 1, 14, 16, 2, 14, 17, 1, 16, 6, 2, 16, 13, 1, 16, 17, 1, 17, 12, 1, 18, 3, 2, 18, 6, 1, 19, 15, 1 }